Enforce BIM delivery requirements automatically
As a building owner, you define your delivery requirements in IFCLint once and validate every delivery automatically. No manual recounting, no relying on assurances.
Typical challenges
Requirements that only exist on paper
BIM briefs are written in Word and then sit in folders. No one checks whether they were met.
No audit trail for sign-offs
Was version 3 of the IFC file checked, or version 2? Who signed it off? What state were the rules in?
Unusable as-built data
After handover, properties that would matter for FM and CAFM are missing. Correcting them after the fact is laborious.
How IFCLint solves it
Requirements as a rule library
Your BIM brief is mapped into a validation catalogue in IFCLint. Every delivery is validated automatically against that catalogue.
A complete validation audit trail
Every validation run is stored with its IFC version, rule version and result — revision-proof and traceable.
FM data correct from the start
Define the required properties for asset management as early as the construction phase — and have them delivered automatically.
“Since we started using IFCLint, we know exactly what was delivered at sign-off — and what was not.”
The relevant features
- A central validation catalogue library
- Revision-proof validation runs
- IDS export for distribution to designers
- Comparison of two deliveries
- BCF export for defect lists
- Team and role management